BTC operator training simulators have the same appearance and features as actual power plant control rooms. Therefore, observational and operational training can be performed with the same sensation as real operation.
BTC possesses 3 simulators in total, which represent the three different generations of control panels that have been adopted by BWR nuclear power plant control rooms in Japan. These control panels and the console in the instructor room are linked to the simulation computers. These control panels can be manipulated by the instructors and by the trainees.
Second Generation Control Panel 1100MWe |
•Reference Plant: BTC Simulators No.2 Fukushima Daini Nuclear Power Station Unit 3(BWR-5) BTC Simulators No.4 Kashiwazaki-Kariwa Nuclear Power Station Unit 4 (BWR-5) |
---|
Third Generation Control Panel 1356MWe |
•Reference Plant: Kashiwazaki-Kariwa Nuclear Power Station Unit 6 (ABWR) |
---|
The same control panel, operation, and ambiance with an actual control rooms.